GLCC Room 150 + 152 SVSI Upgrade Walkthrough
From Chris Robinson March 2nd, 2024
2 plays
2
0 comments
0
Related Media
This is a pre-commission walk through of the newly upgraded GLCC 150 and 152 Audio Visual System.
See how a pre-walk through the AV system is done. This is not the finalized walk-through. This is a test to see if I find any programming bugs, demonstrate device and signal testing, and tour of room.
Installed new SVSI system all connected via a Managed Netgear Switch.
Biamp Tesira CI for the audio processing using all Dante Audio.
1 Shure Ceiling Microphone Array
2 Shure Wireless Mics.
Features in room PC, external HDMI connection for your laptop, Document Camera, and a Mersive POD for wireless presentation.
AMX touch panel and Controller for user interface and programming.
This aint the middle of the mall.
- Tags
- iamchris@gatech.edu
- biography
- You may not know this by looking at me, but I am an expert at diaper changing.
- Appears In
Link to Media Page
Loading